Steel Front Doors for Managing Agents and Property Managers
Steel Front Doors for UK Property Managers: FRA Remediation, Section 20 Support, Building Safety Act 2022 Evidence
Built for the managed portfolio
FRA remediation, Section 20 consultation, building safety case evidence and single-supplier portfolio programmes
Managing agents have absorbed more compliance load in the last five years than the previous twenty. Fire Safety Act 2021 obligations, Building Safety Act 2022 case submissions, FRA action items inherited from previous agents, Section 20 consultation evidence trails for leasehold works, PEEP coordination, principal accountable person registration. Front doors sit in the middle of most of it, because the front door is the line between the unit and the common parts.
SteelR manufactures and installs bespoke steel entrance doors directly, with full certification pack registered against each unit, Section 20 itemisation supplied in the format leasehold consultation requires, and a single accountable point of contact across a multi-building portfolio. This page sets out the specification, consultation support and aftercare model most managing agents and block managers need to see during procurement.

FRA remediation
FD30S standard, FD60 available, evidence pack per unit
- FD30S fire and smoke rated (Approved Document B)
- FD60 available for common areas and escape routes
- PAS 24:2022 certified (Approved Document Q)
- BS EN 1627:2011 RC4 single leaf, unglazed (Standard)
- Secured by Design approved
- LPS 1175 SR3, SR4, LPS 1673 upgrades available
- Address-registered certificate pack per unit
Section 20 consultation
Itemised written specification, schedule of rates, fixed pricing
Building Safety Act 2022
Address-registered evidence pack, supports the case file
Resident communication
Single-day install per unit, full PPE, end-of-day clean-down
Portfolio programme
Single supplier, single contact, consistent across the managed stock
Continue Reading
Related reading
Common Questions
Frequently asked questions
Can SteelR help us close out FRA action items on flat entrance doors?
Yes. FRA remediation on flat entrance doors is one of the most common reasons a managing agent contacts us. Our FD30S fire and smoke rated doors satisfy Approved Document B requirements for individual flat entrance doors, with FD60 available for common-area doors and protected escape routes. We work directly from the FRA report to confirm specification, install evidence and the certification documentation required to close out each action item. Address-registered certificate packs are supplied per door for the building safety case file.
Does SteelR support Section 20 consultation requirements?
Yes. Where the works exceed the Section 20 threshold under the Landlord and Tenant Act 1985, we supply the cost-itemised written specification, the schedule of rates and the supporting technical documentation that the managing agent needs to satisfy the consultation requirements. Where the leaseholder consultation includes the requirement to obtain estimates, we supply our quotation in the format that aligns with how managing agents present competing bids to lessees. Pricing is fixed at programme commencement and held for the duration of the contract.
What evidence does SteelR provide for the Building Safety Act 2022 building safety case?
Every SteelR door ships with a complete certification pack: PAS 24:2022 certificate, BS EN 1627:2011 RC4 single leaf, unglazed certificate of compliance as Standard, FD30S fire and smoke rating to BS 476-22 or BS EN 1634-1, and Secured by Design accreditation. For Higher-Risk Buildings as defined under the Building Safety Act 2022, FD60 fire rating and LPS 1175 SR3 (LPCB police-preferred Enhanced upgrade), SR4 D10 Issue 8 (Commercial-grade upgrade) or LPS 1673 attack-resistance (Ultra-high, by enquiry) are available where the building safety case justifies the upgrade. Certification packs are address-registered against each unit and held on file indefinitely so future case submissions, transfer of accountable person or freehold transfer have the evidence trail intact.
How do you minimise disruption to residents during installation?
Single-leaf doors install in one working day per unit. Double doors or sidelight configurations take two days. Resident communication packs are issued in advance covering scope, timing, access requirements and out-of-hours contact details. For occupied units we work to scheduled time windows agreed with the managing agent's resident liaison or block management team. PEEP (Personal Emergency Evacuation Plan) considerations for vulnerable residents are coordinated with the managing agent before scheduling. The site team operates with full PPE, dust sheets and end-of-day clean-down on every install. No mess left for the resident, no follow-up call from the agent.
Can we run a single-supplier programme across multiple buildings?
Yes. Portfolio-level supplier programmes are standard. The same project lead and install team carry through every building in the portfolio, so specifications, certification format, install standard and aftercare are consistent across the managed stock. The project file is maintained centrally so a Building 4 install in 2028 references the Building 1 specification and certification format from 2026 without drift. Pricing is fixed at programme commencement against the agreed schedule and held for the duration of the contract, regardless of how many buildings the programme covers.
Is there a single point of contact across the duration of a programme?
Yes. Every SteelR contract has a named project lead from survey stage through to handover and into the warranty period, supported by a small team that does not rotate. The project lead is reachable directly by phone or email throughout. For multi-building portfolio programmes spanning years, we maintain the project file so a Building 4 install in 2028 references the Building 1 specification from 2026 without re-survey of the original units. This particularly matters for managing agents who change Building Safety Manager personnel during the programme.
Bespoke · UK manufactured · BS EN 1627 RC4 · LPS 1175 SR3 / SR4 available
Enquire about a bespoke SteelR door for Property Managers
Free consultation with our design team. No obligation. Every door is manufactured in the UK to your specification. Standard residential spec is BS EN 1627:2011 RC4 single leaf, unglazed. LPS 1175 SR3 and SR4 enhanced and commercial-grade certifications are available on request, with LPS 1673 attack-resistance by enquiry. Installed by our in-house fitters.